enes +5411 4346-1000
·
info@eof.com.ar

The Secretary of Energy approved plans for transmission system expansions and modernization

Through Resolution 507/2023, the Secretariat of Energy (SE) approved a series of extensions and modernization of the electric transmission system. This is the result of the work of the Electric Transmission Commission formed by different sectors of the industry and the Secretariat of Energy. The purpose of this commission is to survey and identify expansions of the electric transmission networks considered necessary and develop an Electric Power Transmission System Expansion Plan.

Access the complete text of the Resolution here.


This publication does not constitute a legal opinion on specific issues. If necessary, specialized legal advice should be sought.

For further information, please contact:

Agustín Siboldi – SiboldiA@eof.com.ar

Jorge Muratorio – MuratorioJ@eof.com.ar

Agustina Fanelli Evans – FanelliA@eof.com.ar

María Fernanda Derudder – DerudderF@eof.com.ar